- Home
- ยป
- Company Brief
- »
- Infrastructure & Facilities
Infrastructural Set-Up
Machine | Make | Capacity |
Multi Header-Imported 4 Die&4Blow | Green Wood & Battle ltd. (UK) | M12x L 100mm |
Header-3/8 | Sand | M10 x L 100mm |
Trimmer -3/8 | Sand | M10 x L 75mm |
Thread Chaser | Sand | M10 x L70mm |
Centreless Grinding-3 Nos | Bhavan Sons | Dias 3mm to 60mm |
Traub-3 Nos | S.G.S. | A 25 |
Thread Rolling-3 Nos | WMWM & MTE- 15 | 0.7pitch to 3.5 pitch |
Lathe | ANIL | 41/2feet |
Hydraulic Crimping | Special Designed | M10 Nut |
Manufacturing Unit
We inherit a capacious Manufacturing Unit and Warehousing & Packaging Unit, which is well equipped with all the facilities required for proper storage of our products. This unit is maintained by highly trained experts who make sure that the products are stored safely. We have a fully organized system of storing and retrieving our products, which streamlines supply process. Our warehouse is fitted with fire extinguishing measures and is well-connected to roads and highways. We also have a highly efficient packaging unit, which works under the supervision of experts. These experts make sure that the products are packed using quality packaging material.